How to obtain a condition endorsement?

Your planning permit has advice as part of a condition that states “once the design drawing has been approved the Council will issue a condition endorsement” what do you do?

 You will need to submit to the Council the drawing, design or detail required by the condition via the condition endorsement submission function in the Council's on line application system. The system is accessible via the City of Hobart eplanning portal.

If you were the applicant you will be able to log back into the system and submit the documentation. If you are a third party and have not used the system previously you will need to register as a user prior to submitting the documentation.

You will note that there is a specified time in which the condition needs to be met (i.e. before commencement of work). The documentation will need to be submitted and the condition endorsement issued before the event.

Where a permit condition is to be met before the issue of a building consent it is recommended that you submit the documentation before the lodgement of the building application. This will avoid any delays in issuing the building consent.

Other documentation can be submitted at any time ensuring there is adequate time to get the condition endorsement before the event (i.e. commencing work). If the condition is not met before the event enforcement action can be undertaken by the Council.

The documentation will undergo assessment as soon as possible by the relevant officer. You will receive the endorsement by email.

If you require any assistance contact City Planning on 03 6238 2711.