| Excess Water Allowance | |
|---|---|
| Property allowance of water quantity if exceeded attracts an excess water charge - in litres per dollar of annual assessed value. |
58.50 litre/$AAV (Does not attract GST) |
| Excess Water Charge | |
|---|---|
| Property charge for water quantity used in excess of the excess water property allowance - dollars per kilolitre of water consumed |
$1.05c per kilolitre (Does not attract GST) |
| Water Meter Reading | |
|---|---|
| Fee charged for special reading between reading cycles |
$50 per reading (Does not attract GST) |
| Water Meter Testing | |
|---|---|
| Applied on request of property owner. Refunded if meter is in error more or less than 5% of full scale in $ per test. | |
|
20mm & 25mm diameter |
$140 per test (Does not attract GST) |
|
40mm & 50mm diameter |
$205 per test (Does not attract GST) |
|
75mm diameter and larger |
$260 per test (Does not attract GST) |
| Hydraulic Investigations | |
|---|---|
|
Private Water Sewerage & Stormwater installation investigation fee for private works |
$120 per hour |
|
Water installation investigation fee for private works using leak detection equipment |
$150 per hour |
|
Water Capacity Report |
$750 per system |
|
Plan Re-assessment Fee |
$150 per hour |
| Subdivisions Water Supply Commissioning | |
|---|---|
|
Hydrant flow and pressure testing |
$200 per hydrant |
|
Water quality sampling and testing |
$500 per standard range of tests |
| Sewerage | |
|---|---|
|
Sewer branch construction for discharge into a Council sewer main or access chamber where the main is in the applicant's property and applicant exposes sewer main - 100mm or 150mm diameter |
$660 per branch (Does not attract GST) |
| Stormwater | |
|---|---|
|
Stormwater branch construction for discharge into a Council stormwater main where the main is in the applicant's property and applicant exposes stormwater main - 100mm |
$660 per branch (Does not attract GST) |
|
Stormwater branch construction for discharge into a Council concrete kerb and gutter system 75 x 150 RHS footpath crossing |
$1,050 per branch (Does not attract GST) |
|
Stormwater branch construction for discharge into a Council concrete kerb and gutter system - 252 x 76 RHS footpath crossing |
$1,100 per branch (Does not attract GST) |
| Water Connections | |
|---|---|
|
Water connection construction from a Council watermain to an applicant's property where the nearest boundary is less than 30metres from the watermain: |
|
|
20mm diameter |
$1,200 per connection (Does not attract GST) |
|
25mm diameter |
$1,250per connection (Does not attract GST) |
| Water Connections Associated with Subdivisions | |
|---|---|
|
Water connection construction from a Council watermain to a proposed property boundary for a new Lot in a subdivision where the boundary is less than 30 metres from the watermain - All sizes including 20mm, 25mm and greater than 25mm diameter. |
Full cost recovery with a Council contribution to the cost where a public benefit is applicable as determined by the General Manager. |
|
Water Connection Locations |
$50 per call out |
|
Hydraulic Infrastructure Location |
Full Cost Recovery |